Climate Change and Environment Consulting Case Studies

CCES Manages Installation of Occupancy Sensors at Major Public Facility

CCES managed the installation of several hundred occupancy sensors throughout the Port Authority Bus Terminal in New York City, one of the largest bus terminals in the US. CCES reviewed plans, cut sheets and specifications, and worked with the designer to finalize the application of sensors to the diverse rooms and needs of the terminal. After stamping the final drawings, CCES managed the installation, ensuring that the proper sensor was being installed in the proper locations throughout the terminal, including the non-public areas. The project proceeded smoothly, and the Bus Terminal was able to begin to achieve major electricity cost savings in a short time frame.

 

CASE STUDIES

Climate Change & Environmental Services (CCES) managed construction management and environmental permitting for East River Housing (ERH) Corporation for operating a boiler house to provide heat and hot water to several apartment buildings with over 2,700 units, combusting over 2 million gallons of No. 6 fuel oil annually..

Read More